FAQs

Questions,
answered.

The questions we hear most from first-time sod buyers, contractors, and superintendents alike.

Stacks of fresh sod rolls

How much sod do I need?

Measure length × width of each area in feet, then divide by the roll or big-roll coverage. Add 5–10% for cuts and waste. We're happy to help you calculate.

How soon should I install after delivery?

Within 24 hours. Fresh-cut sod is a perishable product — the sooner it's on soil, the better it establishes.

When is the best time to install?

Sod can be installed year-round in California. Spring and fall are ideal, but with proper watering, summer installations succeed just as well.

How long until I can walk on it?

Light foot traffic after 2 weeks; full use after 3–4 weeks once the roots have knit into the soil.